Was the reduction fifty per cent, or only one third? The same forty-kilometre week can be either, depending on the starting point you compare it with. It is therefore worth learning to read and calculate the numbers in a pre-marathon taper first. Using our own examples, we distinguish the roles of the peak week, a fixed baseline and the previous week, so that a percentage in the plan means the same thing to runner and coach.
The first question about a percentage: compared with what?
If a plan simply says to reduce by forty per cent, at least two pieces of information are missing: which quantity, and compared with what? Kilometres, running minutes and time in harder sections are separate variables. The baseline might be an earlier week, the average of several weeks or an unusually high maximum. The number becomes a meaningful instruction or description only when these two conditions are stated too.
We calculate the reduction by subtracting the new amount from the starting amount, dividing the difference by the starting amount and multiplying by one hundred. Going from sixty kilometres to forty creates a difference of twenty kilometres; twenty divided by sixty is one third. The reduction is therefore approximately 33.3 per cent. Forty is 66.7 per cent of the original amount: this is the portion remaining, not the reduction.
The two wordings are easy to confuse. Saying something fell to sixty per cent of its original amount is different from saying it fell by sixty per cent. In the first case forty per cent is removed; in the second, sixty per cent. When discussing a plan, it is worth writing down the actual kilometres or minutes alongside the percentage. A misunderstanding in language then need not accidentally produce an entirely different programme.
The same forty-kilometre week can tell two different stories
In our next numerical example, the single highest week of preparation is eighty kilometres, while sixty is designated as the usual comparison baseline. The new weekly distance is forty in both calculations. Against the maximum, this is a fifty per cent reduction; against sixty, it is only one third. The runs actually completed have not changed at all; the difference between the two percentages comes solely from the denominator.
This does not mean comparing with the maximum is always wrong. A plan or analysis may specify exactly that as its baseline. The mistake is treating ratios with two different baselines as if they mean the same thing. If a friend talks about a fifty per cent reduction and you talk about thirty-three per cent, clarify the denominator before judging one programme harder or easier.
In your own calendar, the starting period should be checked and interpretable. If an upload was missing or an unusual event caused weekly distance to jump, note it. Percentage arithmetic carries an incorrect or misunderstood baseline forward precisely; it does not correct it. A neatly calculated ratio can still answer the wrong question if it does not describe the training history on which you want to build the plan.
Enlarge imageA fixed baseline is different from comparison with the previous week
Take another set of our own purely illustrative numbers: the fixed baseline is sixty kilometres and the next three values are forty-eight, thirty-six and twenty-four. Reductions from the baseline are twenty, forty and sixty per cent. If we instead always compare with the preceding value, the steps are twenty, twenty-five and approximately thirty-three per cent. Both descriptions can be correct; they simply ask different questions.
Twenty, forty and sixty per cent here are not three successive subtractions to apply. If someone reduces the previous amount by twenty per cent each week, sixty becomes forty-eight, then 38.4 and finally 30.72. At the end, 51.2 per cent of the original amount remains, so the overall reduction is 48.8 per cent. Repeated percentage changes multiply rather than simply adding together.
The plan should therefore have separate columns for the difference from the fixed baseline and from the previous week if both are needed. If not, choose one and name it consistently. Readers can then immediately see whether you are explaining the shape of the series or the total change from the starting point. Careful arithmetic is not bureaucracy: it supports a shared understanding of the same programme.
| Weekly value | Reduction from the 60 km baseline | Reduction from the preceding row |
|---|---|---|
| 60 km baseline | 0% | – |
| 48 km | 20% | 20% |
| 36 km | 40% | 25% |
| 24 km | 60% | 33.3% |
How did the large marathon analysis define its baseline?
The study by Smyth and Lawlor used data from more than 158,000 recreational marathon runners. It examined the four weeks before the race as the taper period and formed a baseline from the average weekly distance in the fifth and sixth weeks before the race. This is a precisely described research method, not a personal calendar automatically prescribed for every reader.
The analysis distinguished patterns that decreased more consistently from those that also included an increase along the way. Longer, consistent reductions were associated with better race results in certain comparisons. Participants were not, however, randomly assigned a taper programme. Its observational nature must be retained when interpreting the association; a group-level difference cannot guarantee a personal time saving.
The task in your own plan is not to force yourself into a category with the same name. It is more useful to adopt the methodological clarity: know which period is the baseline, what falls within the taper window and which variable you assess. Research findings and personal programmes then remain distinct. Naming the baseline in advance also helps prevent choosing a convenient explanation to fit the result afterwards.
A reduction in distance does not tell you the reduction in running time
The time ratio can differ despite the same kilometre ratio if session pace changes. In our example, a sixty-kilometre week at an average of six minutes per kilometre takes three hundred and sixty minutes. A thirty-six-kilometre week at six and a half minutes per kilometre takes two hundred and thirty-four minutes. Distance fell by forty per cent, while time fell by thirty-five per cent. The two numbers differ, and neither should be assumed automatically from the other.
Use the same concept for time measurement too. Are you comparing moving time with moving time, or elapsed time from start to finish? The Garmin FIT activity file documentation treats summary messages, individual records and events separately. Different summaries may be based on different data, so you also need to check the label of the diary view.
The practical solution is simple: keep distance and your chosen measure of running time in two columns. You do not need to analyse the technical file for every session to calculate this, but it matters that two different concepts of time do not become mixed. If one week involved longer stops, note them. Data supports planning when, at the end of the comparison, you are still discussing the same quantity as at the beginning.
The proportion at an intensity and its absolute duration are separate data too
During a taper, total running minutes and time in a specified intensity range do not necessarily change in the same proportion. In our own example, sixty out of three hundred total minutes fall in a particular range: twenty per cent. If total time falls to one hundred and fifty and time in that range to thirty, the proportion remains unchanged. If sixty remains, the proportion rises to forty per cent. Absolute duration and proportion provide different information.
The large analysis of marathon training intensity distribution also presented the amount in each range and its proportion separately. Moreover, the definition of zones was specific to the research. This is a reminder that before tracking harder minutes, you need to know which classification you use. A watch’s five zones should not be called identical to a study’s three ranges without explanation.
This article’s arithmetic example does not prescribe how much harder activity should remain in a taper. It shows why a single percentage for total volume is incomplete. Record the training task and its associated duration separately. Discussing these with your coach also makes the purpose of the change clearer: the aim is to carry out a specific, understood programme, rather than make the proportions of a coloured area in an app look better.
Enlarge imageDefine the boundaries of race week in advance
Including the marathon distance can radically change the race-week total. If twenty-four kilometres of training take place before the start, and the 42.195-kilometre race itself enters the same weekly report, the total becomes 66.195 kilometres. This is a different number from pre-race training volume. When interpreting a taper, clarify beforehand which you mean, or the reduction may appear to disappear.
The calendar week and the week before the start are not always identical either. A Sunday race and a Saturday race may put different dates in an automatic weekly total. Add the start and end dates to your comparison sheet and put the event on a separate row. There is no need to rewrite how the entire app works: simply preserve the boundary to which the percentage refers in your own assessment.
Missed or modified sessions belong in the actual column. If twenty-six kilometres were completed instead of the planned thirty, do not call the plan the actual achievement. The reason for the difference can be a separate note. Later assessment of the taper then examines the programme that actually brought you to the start, rather than an idealised calendar. Accurate data is a record, not a judgement.
A small table that prevents misunderstandings
Put the baseline’s name, date range and value in the first row of the discussion sheet. Each subsequent row should contain the plan, actual amount and percentage difference from the baseline. Time and distance can have separate columns, with the intensity task described briefly in words. Dozens of metrics are unnecessary: you need enough data to understand precisely the same thing by the recorded ratio a week later.
Two quick questions are enough for checking. First: have I written the percentage remaining or the percentage removed? Second: did I compare with the original baseline or with the previous week? When the answers are clear, most arithmetic misunderstandings become visible. You can then discuss the content of the programme instead of talking past each other because the denominator is uncertain.
Taper percentages are therefore useful when they refer to a precisely named variable and a baseline fixed in advance. The peak week, usual week and previous week can offer different comparisons for the same running completed. Arithmetic does not select a personal programme for you, but it makes the decision transparent. This leaves more room in pre-race planning for the actual task and less for misunderstood percentages.
Sources
- Smyth and Lawlor: marathon tapering and defining the study baseline.
- Garmin Developers: FIT activity file data and summaries.
- Muniz-Pumares and colleagues: marathon intensity distribution.
How Futószív articles are prepared: our editorial guidelines.


